X changentsAre You a Change Agent? Click Here to Start Telling Your Story!
X

Translate Change Agent Stories and Volunteer Requests.

2 days remaining for Jeremy and production crew in Lobitos

Mar 18, 2010 09:30 pm

With time running down in Lobitos the crew works hard for needed footage. The laid-back lifestyle of Lobitos makes the shot list look even longer.

Jeremy works with a student in secondary school as the photo program is launched.

The local children are amazed with the sound equipment used by the production team.

The crew, equipped with their underwater gear, goes for a swim with the local surfers.

Permalink | Leave a comment  »



This article was originally posted at capturedoc.posterous.com, click to read in original context.

Write a Comment

Flag Flag as spam/inappropriate